Epoxy flooring help centre
Help centre35 answers indexedAnswers first.
Then a person.
Almost everything people ring to ask is already written down somewhere on this site: in the four days of the process, in the cure clock, in the section through the laminate. This is the index to all of it, grouped by what you are actually trying to work out. If the answer is not here, the last thing on the page is six ways to reach somebody who has stood on a slab this week.
Start from what you are working out
Six things people arrive trying to settle. Each one gathers the places on this site that already answer it (a whole page, a section of one, or a single question), so you are reading the long version rather than a summary of it.
Choosing a floor
Which of the six systems your room actually needs, what is inside it, and how to see it in your own light before you commit to anything.
What it costs, and how we price it
The published rate and what it covers, the four things that move it, and the two ways to turn it into a figure for your own slab.
Booking and getting ready
Lead times, what has to be off the floor before a grinder comes off the truck, and the four things that cost you a day if they are not done.
While we are on site
The four days, hour by hour: what is loud, what smells, how much dust there really is, and whether you can keep trading through it.
Living with the new floor
The cure clock, what to clean it with, what never to clean it with, and the one mistake almost every owner makes in week one.
Warranty, defects and recoats
What is covered and for how long, what voids it, when the wear layer is due for renewal, and what to do if something is wrong in year two.
The six that come up every week
- How much does epoxy flooring cost in Nairobi?What it costs
- How far ahead do we need to book you?Before & during the job
- What actually happens at a site visit?Before & during the job
- Do I have to move out while you work?Before & during the job
- When can I walk on it, load it, drive on it?After handover
- What does the warranty cover, and what voids it?After handover
- Can you lay over tiles?Suitability & materials
Before you open any of them
- 01
Roughly how big
Paces will do. Length by width in metres, and say if it is more than one room; the difference between 40 m² and 400 m² changes the system, not just the price.
- 02
What the floor is now
Bare concrete, tiles, old paint, a failed epoxy, or a screed you have never seen under. If you do not know, say you do not know. It is the survey question either way.
- 03
What it has to survive
Cars, forklifts, a deep fryer, bare feet, a health inspection. The room decides the system far more often than the budget does.
Six ways to reach a person
Nothing above answered it, or the answer only raises another question. These are every way in, what each one is for, and how long it takes to come back.